Refurbishment of garden at the Brain injury Recovery Unit
Client
Frenchay Hospital
Location
Frenchay, Bristol
Project Dates
June 2019- August 2019
Duration
4 Weeks
Value
£40K
“The garden is
looking really
fantastic and the
patients and staff
love it – so thank
you for doing
such a good,
professional job”
Opportunity
RDT Build was appointed to refurbish the existing unused garden space at the brain injury recovery unit.
Scope of works
The works consisted of:
• removal of the existing planting
• hard landscaping
• installation of new paving
• resin bound gravel
• pergola
• furniture and soft landscaping.
Key Challenges and Outcome
The project was carried out in a live environment with the key issues being noise, dust & segregation from patients. The project was completed within the timescale required and within budget.
Before
Original garden space, very much overgrown with old paving
After
After
BUILDING QUALITY IS WHAT WE DO
Refurbishment of wing at the Brain injury Recovery Unit
Client
Frenchay Hospital
Location
Frenchay, Bristol
Project Dates
November 2016 – December 2019
Duration
6 Weeks
Value
£60K
Opportunity
Located within the grounds of the former Frenchay Hospital in Bristol, RDT Build was appointed to work on the full refurbishment of a wing.
Scope of works
The project scope of works consisted of:
• demolition and alterations to existing rooms in order to form new rooms
• installation of new partitions
• ceilings, flooring, mechanical and electrical works to suit the new rooms
• installation of bifold doors
• full decoration throughout
Key challenges and outcome
All works were completed within time and to budget. Due to urgent deadlines completion date decoration of the new areas all carried out in a short period to meet the clients opening date.