One of our main projects for 2020 included removing the existing façade to a 3-story block of flats in Kingswood, in order to remove and replace rotting timber to the existing timber frame.

All rotting timber was completely replaced before re-building the façade and internally installing new plasterboard, reinstalling the kitchens, new flooring, and providing new consumer units. Due to the works being carried out in a live environment all occupants were kept up to date throughout, with the minimum disruption to all occupants living there.

For the full case study including details on how we did this while working through a pandemic, click here.